Project details
Scope of work
The underside of the structure was blast cleaned to SA2.5 standard with an M24 Network Rail system applied using scaffold access and containment under traffic management lane closures, in two phases. The trackside of the structure was mechanically prepared to St3 standard utilising 54 hour disruptive possessions for the preparation and priming, and RoTR possessions for the remaining coating works.